The Paseo Public Prototyping Challenge is coming soon, in approximately 2.5 weeks. There is still work to be done at this point. This includes testing on the new loop sections that have been built, testing the new code on the new 3-D printed bogies, and the build of the solar panels.
I am personally dealing with the loss of a family member who passed away a few days ago. Fortunately, I have thus far ensured any work required of me and the track fabrication team has been completed as early as possible, so the hope is that there are no issues that crop up that require my immediate attention. Unfortunately, with the timing as things are, problems showing up would not be unexpected, but the ideal is that things go smoothly.
No comments:
Post a Comment